xAI is facing a lawsuit for operating over 400 MW of gas turbines without permits

The Colossus data center was allegedly operating as many as 35 gas turbines without pollution controls in a region that already had poor air quality.

Jun 18, 2025 - 18:33
 0
xAI is facing a lawsuit for operating over 400 MW of gas turbines without permits
The Colossus data center was allegedly operating as many as 35 gas turbines without pollution controls in a region that already had poor air quality.